PKM PEMBUATAN PROTOTYPE PEMBANGKIT LISTRIK TENAGA ANGIN UNTUK PENERANGAN DUA DERMAGA DAN PERAHU NELAYAN TRADISIONAL DI PULAU PANJANG BANTEN

Authors

  • Dedy Khaerudin Universitas Bina Bangsa
  • Muhamad Akbar Universitas Bina Bangsa
  • Sinda Sundari Universitas Bina Bangsa
  • Islamiati Ria Amalia Universitas Bina Bangsa

DOI:

https://doi.org/10.53067/icjcs.v1i3.17

Keywords:

Electricity, PLTB, PLTD, Solar cells, Wharf, Ship, Listrik, Surya sel, Dermaga, Kapal

Abstract

The activities of the residents in general cannot be separated from the Pier and Boat, considering the main livelihood of the residents of Pulau Panjang Village, especially Kp. Peres as fishermen. The wharf is a place for residents to go back and forth from and to the island, as well as a place for loading and unloading of goods and up and down people or passengers to and from the ship both during the day and at night, while the ship itself is a means of transportation for residents, a place to carry goods, fruit products from the island and as a vehicle used by fishermen to catch fish. Both the wharf and the ship need lighting to help activities at night, especially the pier, the current condition at night is very dark without any lighting, even though Pulau Panjang Village has solar cells at 2 points, and the PLTD is not optimal. The solar cell condition is no longer functioning. While the PLTD does not supply electricity to the Pier. An alternative to this condition is to build a wind power generator (PLTB), considering that the wind potential is very good in the island area surrounded by the ocean. 1 PLTB device that is designed to produce an output of 20 volts. To illuminate the 2 piers, 8 units of generating equipment were made, while for 100 fishermen from Kp. Peres, training and coaching were made on the process of making PLTB. The activities that have been carried out have had a positive impact on all residents of Kp. Peres, Pulau Panjang Village so that the problems that Kp. The problem of electricity supply problems both at the pier and on the ship can be resolved through the manufacture of PLTB equipment. The activities that have been carried out have had a positive impact on all residents of Kp. Peres, Pulau Panjang Village so that the problems that Kp.Peres the problem of electricity supply problems both at the pier and on the ship can be resolved through the manufacture of PLTB equipment

Downloads

Download data is not yet available.

References

Bachtiar, A & Hayattul, W (2018). “Analisis Potensi Pembangkit Listrik Tenaga Angin PT. Lentera Angin Nusantara (LAN) Ciheras” Jurnal Teknik Eelektro ITP, Vol. 7, No. 1

Baudjema, Z., et.all (2017). “A novel direct torque control using second order continuous sliding mode of adoubly fed induction generator for a wind energy conversion system”. Turkish Journal of Electrical Engineering & Computer Sciences. Turk J Elec Eng & Comp 25: 965 – 975

Bouderbala, M., et.all (2018). “Direct and indirect vector control of a doubly fed induction generator based in a wind energy conversion system”. International Journal of Electrical and Computer Engineering (IJECE). Vol.9, No.3.

Cabrera, P., et.all (2021). “Large-scale optimal integration of wind and solar photovoltaic power in water-energy systems on islands”. Energy Conversion and Management. Vol.235, Page 113982.

Dhivya, B & Malarvizhi, K (2017). “Design of hybrid concentrated solar and wind power plant for the autonomy of islands”. International Conference on Inventive Systems and Control (ICISC). IEEE. Electronic ISBN:978-1-5090-4715-4

Hund, J.V., et.all (2021). “Buoyancy Energy Storage Technology: An energy storage solution for islands, coastal regions, offshore wind power and hydrogen compression”. Journal of Energy Storage. Vol.40. page 02746

Mulyono, J., et.all (2018). “Desain baling-baling kincir angin sumbu horizontal”. Simposium Nasional RAPI XVII. ISSN 1412-9612

Perpres Nomor 22 Tahun 2017. “Rancangan Umum Energi Nasional (RUEN)”

Petrakopoulou, F., Robinson, A & Loizidou, M (2016). “Simulation and evaluation of a hybrid concentrating-solar and wind power plant for energy autonomy on islands. Renewable Energy. Vol.96, page 863-871

Downloads

Published

2021-08-01

How to Cite

Khaerudin, D. ., Akbar, M. ., Sundari, S. ., & Amalia, I. R. . (2021). PKM PEMBUATAN PROTOTYPE PEMBANGKIT LISTRIK TENAGA ANGIN UNTUK PENERANGAN DUA DERMAGA DAN PERAHU NELAYAN TRADISIONAL DI PULAU PANJANG BANTEN. Indonesian Collaboration Journal of Community Services (ICJCS), 1(3), 126–134. https://doi.org/10.53067/icjcs.v1i3.17